xps15安装ghowin10-()
来源:191路由网 2022-12-16 21:41:19
Bidders Pre Qualified for 603km Jubail – Buraydah Independent Water Transmission Pipeline
沙特水合作公司(SWPC)公布了朱拜尔-布代赖独立水系统输送管道项目合格预审投标人名单。
Saudi Water Partnership Company (SWPC) announces the Pre Qualified Bidders for Jubail – Buraydah Independent Water Transmission Pipeline (IWTP) project.
该项目每天涉及65万立方米的输送能力,水运工程建设工程长达603公里。
The project involves the construction of water transmission pipeline of capacity up to 650,000 cubic meters per day, and lengths of 603km.
以下是合格的资格预审投标企业:
Following is the list of Pre-qualified bidders:
1 | Abdulaziz Alajlan Sons Co. for Commercial & Real Estate Investment – Ajlan & Bros |
2 | Abdullah Ibrahim Al Sayegh & Sons Co. |
3 | Abu Dhabi National Energy Company, PJSC (TAQA) |
4 | AliShar Contracting Company Ltd. |
5 | Alkhorayef Water & Power Technologies |
6 | Al Sharif Group for Cont. Dev. & Trad. (Holding) Limited Co |
7 | Bin Omairah Contracting Company Ltd |
8 | China Gezhouba Group Overseas Investment Company Co. Ltd (CGGCOIC) 中国葛洲坝集团海外投资有限公司(中国) |
9 | China Harbour Engineering Company Ltd (CHEC) 中国港湾工程有限公司(CHEC) |
10 | China Railway Construction Corporation (International) Limited 中国铁建国际集团有限公司 |
11 | China State Construction Engineering Corporation Limited 中国建筑集团有限公司 |
12 | CNIC Corporation Limited 国新国际投资有限公司 |
13 | Cobra 电脑 Instalaciones y Servicios, S.A. |
14 | Gulf Investment Corporation G.S.C. (GIC) |
15 | Lamar Holding W.L.L |
16 | Marubeni Corporation |
17 | Mowah Co. (CJSC) |
18 | Mutlaq Al-Ghowairi Co. for Contracting Limited (CJSC) |
19 | Nesma Company Ltd. |
20 | Norinco International Cooperation Ltd. |
21 | SICIM S.p.A. |
22 | Vision International Investment Company |
根据通知,沙特水务合作公司将根据沙特水务合作公司BOOT模型开发商或联合开发商。
As per the notification, SWPC will conduct a competitive process to select a developer or developer 电脑 consortium to develop the Project on a Build, Own, Operate and Transfer (BOOT) basis.
在《水运协议》下,开发该项目的项目公司将为沙特水务公司提供全部运输能力。
The project company developing the Project will provide the entire transmission capacity to SWPC under a Water Transmission Agreement (WTA).
水运协议有效期为35年。
The term of the WTA is expected to be up to 35 years.
代表沙特政府财政部签署的《信贷支持协议》将支持沙特水务合作公司在水运协议下的义务。
SWPC’s obligations under the WTA will be supported by a credit support agreement entered into by the Ministry 电脑 of Finance on behalf of the Government of the Kingdom of Saudi Arabia.
沙特水务合作公司的顾问为多家协同咨询,其中IFA Inc是财务咨询单位和法律咨询单位的主要咨询单位Amer Al Amr技术咨询单位律师事务所Fichtner GmbH & Co. KG。
SWPC advised by Synergy Consulting IFA Inc. (as Lead and Financial Adviser), Amer Al Amr Law Firm (as Legal Adviser) and Fichtner GmbH & Co. KG (as Technical Adviser).
电脑
相关阅读
-
-
u盘缩水怎么修复工具下载-(怎样修复缩水u盘)
u如何修复盘缩水工具下载(如何修复缩水u盘)前天宏旺半导体发了一篇文章,《ICMAX教你重用坏手机eMMC》小伙伴们对eMMC如何重用芯片还是比较感兴趣的,今天身边碰巧有个朋友的机顶盒坏了,想提取里面的数据,只是手头有个读卡器,就给他做个U盘,和大家分享,文末有注意事项提示哦。提前说一些注意事项:拆卸emmc芯片需要热风枪焊接...
2022-12-16
-
-
xps15安装ghowin10-()
xps15安装ghowin10()BiddersPreQualifiedfor603kmJubail–BuraydahIndependentWaterTransmissionPipeline沙特水合作公司(SWPC)公布了朱拜尔-布代赖独立水系统输送管道项目合格预审投标人名单。SaudiWaterPartnershipCompany(SWPC)anno...
2022-12-16
-
-
制作优盘启动盘工具排行-(优盘启动盘制作工具哪个好)
制作优盘启动盘工具排名(优盘启动盘制作工具哪个好)有网友私信,想自己安装系统,但不知道用什么u盘启动工具,u盘启动工具排名今天,我将与大家分享四个更好的u盘启动工具,这是我一直在使用的一是操作简单方便,操作兼容性强。四个u盘启动工具分别是u启动u盘启动工具:电脑u深u盘启动工具老白菜u盘启动工具电脑新毛桃u盘启动工具电脑安装注意事项:安装时一定要注意不要安装在c...
2022-12-16
-
-
win10系统怎么用鼠标不能用-(win10系统怎么用鼠标不能用了)
win如何使用鼠标10系统?(win如何使用鼠标10系统?了)当鼠标移动被卡住时,我们需要知道鼠标是无线鼠标还是有线鼠标,然后开正确的处方。方法:假如你的鼠标是无线蓝牙鼠标:1、在Win蓝牙图标在10系统的任务栏托盘中找到,右键单击并选择[打开设置]。2.在打开的选项框中,确保选定的允许蓝牙设备查找此计算机,然后单击确定保存。电脑3.右键单击开始菜单按钮,然后在弹...
2022-12-16
-
-
苹果一体机u盘启动如何设置-(苹果一体机u盘启动如何设置密码)
如何设置苹果一体机u盘启动?(如何设置苹果一体机u盘启动?密码)一、制作MacOS启动U盘1.制作和启动U盘需要满足两个条件:A.准备16GB或上述U盘,并格式化为【MacOS扩展格式】B.已下载MacOSMojave的安装器2、在【启动台】→【其他】→【终端】输入以下命令sudo/Applicati...
2022-12-16
191路由网 - 192.168.1.1,192.168.0.1无线路由器设置教程
版权声明:本站的文章和图片来自互联网收集,仅做分享之用如有侵权请联系站长,我们将在24小时内删除